• James Townsend

Grand River Project at Exit 77 Should Wrap up by Friday


Paving was completed today on W. Grand River Ave. and temporary two way traffic markings have been set up. Weather permitting, permanent pavement markings, guardrails and shoulder grading will occur on Wednesday and concrete ramps will be placed at Rowe St. on Friday.

Drivers should be cautious as traffic will still be managed by flag crews during final completion.

TSBS Ad Image.JPG
Little Raiders Logo .png
Meds Cafe Ad Image 2.png

The Portland Beacon is owned and operated by Townsend Small Business Solutions LLC

P.O. Box 331, Portland, MI 48875

Copyright © 2020 All Rights Reserved